Site Prep Cost Calculator for Shed & Slab Pads

Price the ground work under a shed or a slab: clearing, excavation and grading, then either a gravel pad with fabric and a timber frame or a formed concrete slab. Set the pad margin and the slope of the site, then switch to contractor bid mode to build a proposal.

Reviewed by the EstiCube editorial teamPrices updated All calculators
Gravel shed pad in a timber frame on leveled ground with stakes, string line and a wheelbarrow illustration for site prep cost calculator

Before a shed or a slab goes down, the ground has to be cleared, graded and given a firm base. The EstiCube site prep calculator prices each step as its own line: clearing, excavation and compaction, landscape fabric, gravel by the cubic yard, a timber frame, or a formed concrete slab in place of the gravel, plus an optional permit and mobilization.

Enter the size of the building, how far the pad extends past it, the slope of the site and what is growing there now. Results are national-average estimates for a small residential job, and every unit price can be replaced with the figure from a contractor quote.

Want the gravel quantity for a different depth or shape? Use the gravel calculator. Pouring a slab instead? Work out the volume with the concrete calculator. Clearing a lot or acreage rather than a building pad? Price it per acre with the land clearing cost per acre.

Site prep cost: unit prices used

Clearing, grading, fabric and the slab are priced per sq ft of pad. Gravel is priced per cubic yard, with 15% added for compaction, and the timber frame per linear foot of pad perimeter. The total is never less than the minimum job charge. The clearing rates are small-pad rates, for the footprint of a shed or slab. To clear a whole lot or acres, use the land clearing calculator.

Line itemUnit priceNotes
Clearing, grass$0.35 per sq ftLawn or light growth; $59 for a 168 sq ft pad
Clearing, brush$1.25 per sq ftBrush and small shrubs; $210 for 168 sq ft
Excavation, grading & compaction$1.50 per sq ftLevel site; $252 for 168 sq ft, $302 on a moderate slope and $328 on a steep one
Landscape fabric$0.30 per sq ftGravel base only; $50 for 168 sq ft
Gravel base$45 per cu ydGravel base only; 2.4 cu yd at 4 in deep including 15% for compaction, or $107
Timber frame$9 per linear ftGravel base only; 52 linear ft around a 168 sq ft pad, or $468
Concrete slab (4 in, formed)$7.50 per sq ftReplaces the gravel, fabric and timber; $1,260 for 168 sq ft
Permit$100Optional flat charge
Mobilization$250Flat charge to bring crew and equipment
Minimum job charge$800Floor for a very small pad

A default job (12 by 10 ft shed, level site, grass, 1 ft of pad past the shed on every side, 4 in of gravel, fabric and a timber frame) comes to $1,186, or $7.06 per sq ft of pad.

How much does site prep for a shed cost?

With the defaults, a 12 by 10 ft shed on a level lot with a gravel pad that extends 1 ft past it on every side comes to $1,186. The pad is 14 by 12 ft, or 168 sq ft. That is $59 to clear the grass, $252 to excavate, grade and compact, $50 for landscape fabric, $107 for 2.4 cu yd of gravel at 4 in deep, $468 for 52 linear ft of timber frame and $250 of mobilization, or about $7.06 per sq ft of pad.

Size changes the cost per sq ft, because mobilization is a flat charge. A 10 by 8 ft shed (a 120 sq ft pad) comes to $981, or $8.18 per sq ft. A 16 by 12 ft shed (252 sq ft) comes to $1,529, or $6.07 per sq ft, and a 24 by 20 ft building (572 sq ft) comes to $2,709, or $4.74 per sq ft.

A small job can hit the floor. Leaving the timber frame off the default pad leaves $718 of work, which the calculator raises to the $800 minimum job charge. Real quotes also depend on access for equipment, the soil, hauling away the spoil and local gravel prices, so use the pricing section to enter figures from a contractor.

Gravel pad or concrete slab?

A gravel pad is usually the lower-cost way to give a small shed a firm, free-draining base. On the default site the gravel, fabric and timber frame add up to $625. A formed concrete slab priced at $7.50 per sq ft is $1,260 for the same 168 sq ft, which takes the default job to $1,821, or $10.84 per sq ft. That is $635 more than the gravel pad.

Gravel is also easier to adjust later: it can be raked, topped up or levelled again if one corner settles. A slab is more permanent and is often chosen for heavy equipment, a workshop or a building that will stay put for decades. A slab can also be required by a manufacturer's instructions or a local rule, so check before you decide.

The slab line is a single per sq ft price for a 4 in formed slab. A contractor may itemize the base under it, reinforcement and finishing separately, so replace the price in the pricing section with the figure from the quote. To check the concrete volume, use the concrete calculator.

Why the pad extends past the shed

A pad is typically made a little larger than the building so that the walls and the floor edge sit on firm, compacted material rather than right at the edge of the pad, where loose gravel is generally less well supported. The extra width also gives rain running off the roof somewhere to land and drain away, and gives room for the timber frame and for any levelling work around the building.

The margin is the default 1 ft on every side and you can set it from 0 to 3 ft. On the 12 by 10 ft shed, no margin gives a 120 sq ft pad and $981 ($8.18 per sq ft), 1 ft gives 168 sq ft and $1,186 ($7.06), 2 ft gives 224 sq ft and $1,414 ($6.31) and 3 ft gives 288 sq ft and $1,665 ($5.78). The total rises with each foot, but the cost per sq ft falls because mobilization is spread over a larger pad.

Penn State Extension makes a similar point about gravel pads for horse paddocks, saying a shoulder beyond the fence line reduces damage to the edges and that extending the pad beyond the highest traffic zone makes it last longer. A shed is not a paddock and puts far less wear on its pad, but as general practice the same idea carries over: keep the load back from the edge of the gravel.

Slope, drainage and calling 811

Slope only changes the excavation and grading line, which the calculator multiplies by 1.2 for a site 8 to 14 in off level and by 1.3 for one 14 to 20 in off level. On the default pad the grading goes from $252 to $302 on a moderate slope and $328 on a steep one, so the total is $1,236 and $1,262. Brush instead of grass raises the clearing line from $59 to $210 (total $1,337), and bare ground drops it to nothing (total $1,127). A steep site can also need retaining walls or engineering that this calculator does not price.

Drainage matters as much as the material. Penn State Extension, writing about gravel pads for paddocks, says the surface must shed rainwater and snowmelt by a crown or a slope, that the subgrade must be highly compacted and that all vegetation, roots and organic matter must be removed before grading. It also recommends topping the compacted subgrade with geotextile fabric before the gravel goes on. Those steps are what the clearing, compaction and fabric lines in the calculator pay for. A paddock pad is built for horses and light vehicles, so its specification, such as a support base at least 6 in thick, is heavier-duty than a shed pad usually needs; use it as a guide to the steps rather than to the depths.

Excavation can hit buried lines, so call 811 before you dig. 811 is the free national before-you-dig service, and the 811 site says to contact them a few business days before any digging so utilities can mark their lines. A permit, which is an optional $100 line in the calculator, may also be needed for the building itself; your local building department can tell you.

How to use the site prep calculator

  1. Enter the length and width of the shed or slab in feet.
  2. Set how far the pad extends past the building on every side, from 0 to 3 ft.
  3. Choose how far the ground is off level across the pad, and what is growing there now.
  4. Choose a gravel pad with a timber frame or a concrete slab. For gravel, set the depth from 4 to 8 in and switch landscape fabric and the timber frame on or off.
  5. Switch on the permit line if you need to pay for one.
  6. Open the pricing section and replace any unit price with the figure from a quote, such as the gravel price per cubic yard or the grading rate.
  7. Review the line items, the total and the cost per sq ft, then copy the share link or switch to contractor bid mode to add overhead, profit and a proposal.

Site prep FAQ

How much does site prep for a shed cost?

With the defaults (12 by 10 ft shed, level site, grass, a pad 1 ft past the shed on every side, 4 in of gravel, fabric and a timber frame) the calculator gives $1,186, or $7.06 per sq ft of pad. A concrete slab instead of the gravel pad makes it $1,821. Access, soil and local prices change the real figure.

Is a gravel pad or a concrete slab cheaper?

On the default site a gravel pad is cheaper: gravel, fabric and the timber frame add up to $625, while a formed slab at $7.50 per sq ft is $1,260. That makes the job $1,186 with gravel and $1,821 with a slab. A slab is more permanent and may be needed for heavy loads or by local rules.

How far should the pad extend past the shed?

The calculator defaults to 1 ft on every side and lets you set 0 to 3 ft. A margin keeps the walls over firm material rather than the edge of the pad. For the 12 by 10 ft shed the total is $981 with no margin, $1,186 with 1 ft, $1,414 with 2 ft and $1,665 with 3 ft.

How much gravel do I need for a shed base?

The calculator multiplies the pad area by the depth, converts to cubic yards and adds 15% for compaction. A 168 sq ft pad needs 2.4 cu yd at 4 in, 3.6 cu yd at 6 in and 4.8 cu yd at 8 in. At $45 per cu yd the gravel is $107, $161 and $215.

Does a sloped yard cost more to prep?

Yes, because the excavation and grading line goes up. It is multiplied by 1.2 for a site 8 to 14 in off level and by 1.3 for one 14 to 20 in off level. On the default pad that takes grading from $252 to $302 or $328, and the total from $1,186 to $1,236 or $1,262.

Do I have to clear the site first?

Vegetation has to come off before grading. The calculator charges $0.35 per sq ft for grass, which is $59 on the default pad, and $1.25 per sq ft for brush, which is $210. Choose bare ground if nothing needs clearing and the line is dropped, making the default job $1,127.

Do I need a permit for a shed pad?

It depends on the size and use of the building and on where you live, so ask your local building department. The calculator has an optional permit line at $100, which takes the default job from $1,186 to $1,286. Leave it off if no permit is needed.

Should I call 811 before preparing the site?

Yes, if any digging is involved. 811 is the free national service that has buried utility lines marked, and the 811 site says to contact them a few business days before you dig. Excavation for a gravel pad or a slab is digging, so make the call before the crew arrives.